Bali Caring Community

New house assistance to Gede Sudira in Br. Mangku, Ulakan, Karangasem

On August 8th, 2025, we finished building a house for I Gede Sudira, an underprivileged family in Banjar Dinas Mangku, Ulakan Village, Manggis District, Karangasem Regency.

The specifications of the house assistance program are as follows:

  • 2 bedrooms each measuring 2.5 m x 3 m
  • Terrace measuring 1 m x 6 m
  • Total building area 3.5 m x 6 m = 21 m2
  • Ceramic floor
  • Inside wall: plastered and painted bricks
  • Front side/terrace wall: plastered and painted bricks
  • Outside and back wall: unplastered brick
  • Ceiling: Calsiboard
  • Roof: tile

Donor for this house assistance program is: Bali Family Projects.

The following is the process of implementing the housing assistance program:

  • May 11, 2025; BCC Volunteer conducted a survey to Gede Sudira’s house.
  • July 5–10, 2025;
    1) Coordinate with Gede Sudira and family, to determine the location of the building, and find a good day to start building the house.
    2) Coordinate with BCC Volunteer in Karangasem area; I Wayan Sudarsana (0852-3840-0091) to help supervise the project so that the construction of the house is in accordance with the specifications and costs that have been determined.
    3) Coordinate with the appointed builder to explain the specifications of the house and the cost of building the house.
  • July 17, 2025; start building the house
  • August 8, 2025; the house has been completed

Below is some of the documentation that we took.

Documentation of the old house

Documentation during the construction of the new house

 

Leave a Comment

Your email address will not be published. Required fields are marked *

*

Scroll to Top