On October 17th, 2025, we finished building a new house for Made Artawan, an underprivileged family in Banjar Dinas Insakan, Pedawa Village, Banjar District, Buleleng Regency.
The specifications of the house assistance program are as follows:
- 2 bedrooms, each measuring 3 m x 3 m
- Terrace measuring 2 m x 6 m
- Total building area 5 m x 6 m = 30 m2
- Ceramic floor
- Inside wall: plastered and painted bricks
- Front side/terrace wall: plastered and painted bricks
- Outside and back wall: plastered brick
- Roof: spandex
Donor for this house assistance program is: Ekajaya Fast Ferry (PT. Bali Eka Jaya).
The following is the process of implementing the house assistance program:
- August 15, 2025; BCC team and donors conducted a survey to Made Artawan house.
- August 19-24, 2025;
1) Coordinated with Made Artawan and family to determine the location of the building, and find a good day to start building the house.
2) Coordinate with local volunteer; Gede Wiradana (0823-2261-4376) to help supervise the project so that the construction of the house is in accordance with the specifications and costs that have been determined.
3) Coordinate with the appointed builder to explain the specifications of the house and the cost of building the house. - August 28, 2025; start building the house.
- October 17, 2025; the house has been completed.
Here are some of the documentation we took:
Start building the house
Video of the old house
Photos of the new house
Video of the new house











