On January 7th, 2026, we finished building a new house for Made Bagusdita, an underprivileged family in Br. Dinas Goris, Pejarakan Village, Gerokgak District, Buleleng Regency.
The specifications of the house assistance program are as follows:
- 2 bedrooms, each measuring 3 m x 3 m
- Terrace measuring 2 m x 6 m
- Total building area 5 m x 6 m = 30 m2
- Ceramic floor
- Inside wall: plastered and painted bricks
- Front side/terrace wall: plastered and painted bricks
- Outside and back wall: plastered brick
- Roof: spandex
Donor for this house assistance program is: Ekajaya Fast Ferry (PT. Bali Eka Jaya).
The following is the process of implementing the house assistance program:
- October 17, 2025; BCC team and donors conducted a survey to Made Bagusdita house.
- October 21-29, 2025;
1) Coordinated with Made Bagusdita and family to determine the location of the building, and find a good day to start building the house.
2) Coordinate with local volunteer; Made Wiradnya (0822-4577-1583) to help supervise the project so that the construction of the house is in accordance with the specifications and costs that have been determined.
3) Coordinate with the appointed builder to explain the specifications of the house and the cost of building the house. - November 10, 2025; start building the house.
- January 7, 2026; the house has been completed.
Here are some of the documentation we took:
Photos of the old house
Video of the old house
Photos of the new house
Video of the new house
Video 2