On November 7th, 2025, we finished building a new house for Nengah Kardi/Bu Ginir/Kakek Putut, an underprivileged family in Banjar Dinas Insakan, Pedawa Village, Banjar District, Buleleng Regency.
The specifications of the house assistance program are as follows:
- 2 bedrooms, each measuring 3 m x 3 m
- Terrace measuring 2 m x 6 m
- Total building area 5 m x 6 m = 30 m2
- Ceramic floor
- Inside wall: plastered and painted bricks
- Front side/terrace wall: plastered and painted bricks
- Outside and back wall: plastered brick
- Roof: spandex
Donor for this house assistance program is: MASA HITAM – the Student Representative Council (DPM) of the Faculty of Engineering and Planning, Warmadewa University.
The following is the process of implementing the house assistance program:
- May 7th, 2025; the donors conducted a survey to Nengah Kardi house.
- October 1-5, 2025;
1) Coordinated with Nengah Kardi and family to determine the location of the building, and find a good day to start building the house.
2) Coordinate with local volunteer; Gede Wiradana (0823-2261-4376) to help supervise the project so that the construction of the house is in accordance with the specifications and costs that have been determined.
3) Coordinate with the appointed builder to explain the specifications of the house and the cost of building the house. - October 11, 2025; start building the house.
- November 7, 2025; the house has been completed.